
Turnkey barndominium construction
Move-in-ready metal homes: design, slab, steel shell, and full interior finish-out.
Learn more →
Metal buildings, shops & barns
Shops, ag barns, equipment sheds, and shell-only buildings you finish yourself.
Learn more →
Land, utilities & site prep
Pad, driveway, septic, water well, and power so raw land is ready to build on.
Learn more →Building a barndominium in Washington County
- Building permits: in unincorporated Washington County, the county does not require a building or electrical permit for a new build. Inside Brenham city limits, city permits and codes apply.
- Septic: any new septic system needs a Washington County OSSF permit before work begins.
- Floodplain: if the site is in a floodplain, you need a floodplain development permit first. The county's Environmental Health office makes floodplain determinations.
- Lenders and insurers may require plans, engineering, and inspections even where the county does not.
What it costs
2026 Texas builder guides put an installed shell at roughly $50 to $85 per square foot and a standard turnkey barndo at roughly $140 to $180 per square foot, with high-end custom builds above $200. That puts a 2,000 sq ft turnkey home around $280,000 to $360,000 before land, well, and septic. These are published estimates, not quotes. See the cost guide →
Before you call a builder
- Know your land: location, acreage, flood status, and whether it has a well, septic, or power.
- Pick a rough size and layout, including any shop space.
- Set a budget that includes site work, not just the building.
- Talk to a lender who finances barndominiums.
Areas we cover
Chappell Hill, TX · Burton, TX · Independence, TX · Navasota, TX · Bellville, TX · Round Top, TX
Get a free barndominium quote
Tell us about your plans. Independent local builders will contact you to talk through design and pricing.
